At Frontier, you'll ship 12 weeks of engineering in 48 hours and leave with the methodology and tooling to sustain and accelerate that pace.

Everything's changed. The calculus of how I think about engineering and product is fundamentally different than it was four or three days ago.

Ishmael Samuel, CTO · Paragon

You get instant results. So even if you don't believe in something like this, you can spend half a day trying it out, asking it to build something from your roadmap, and see if it does it or not.

Diptano Chodhury, CEO · Tensor Lake

What to expect

Four things you leave with.

01

Shipped Code

Learn the system in your own codebase, not from a slide presentation.

02

System

Leave with a system built on your fundamentals, operating at a new velocity that you carry forward.

03

Evidence

You'll have the receipts. Ship something your team would have previously found unreasonable.

04

New Ceiling

Frontier recalibrates your ambitions and gives you the confidence to compete in the new era of acceleration.

The Method

Not another tool.
A new way of working.

Spec as Code

Intent Engineering

The spec is the product. How strong intent specifications turn autonomous agents into useful engineering teammates.

System Map

Atlas

The map of your system. How Obvious reads your codebase, understands your architecture, and builds with full context.

Beyond Sprints

Parallelism

How your output accelerates. When you stop building in sequential sprints, your team multiplies its production.

Confidence Layer

Verification

How you trust what an agent ships. Review patterns, confidence gates, and the evidence layer that makes every merge decision real.

Close the Last 5%

Feedback

The loop that makes the system sharpen. How real-time feedback during a build improves every subsequent iteration.

See the work move.

0-1 is cool.
0-100 is better.

Recommended2 days

The Full Build

Set unbelievable goals and move your baseline forever.

Day 1Integration, roadmap review, first spec runs
Day 2Full build sprint, steering, underwriting
Lighter option1 day

The Sprint

Get the essentials and ship something wildly impressive.

Day 1A condensed build cycle in a single session

Hear it from the room

A glimpse of the future

It's cooking right now

Six months in three days

The future of creating beautiful things

Six months of work in 48 hours

No more babysitting agents

It nailed the hardest, craziest thing I had

The Experience

What happens in the room

01

Integration

Get Obvious connected to your stack. By the end of this session, your environment is live and your first spec is ready to run.

02

Roadmap Review

You come to learn a new method and leave with a system to rethink your roadmap.

03

Spec Design

The outcome is as good as the spec. Learn from the best on how to write specs that survive orchestration at scale.

04

Steering

Steering is built on a process you've experienced enough times that managing an agent feels native.

05

Underwriting

Learn how to review and underwrite larger change sets without losing fidelity.

Frontier tour

Where Frontier
is happening.

More cities coming. Register and tell us where you want us next.

Past
ATLApril 2026 — Complete
ATLApril 15–16, 2026 — Complete
SFOApril 22–23, 2026 — Complete
Future

Before you register

No minimum maturity level is required, but Obvious works best when it can read your codebase and understand your patterns. Teams with at least 6 months of active development get the most out of the sprint. Greenfield projects can participate but typically ship smaller scope in the two days.

If what we're saying is true, there's not a higher-leverage use of two days for your team.